Perimeter area formwork
The location and size of the area for each room is defined to incorporate water, drainage connections and electrical points. The perimeter of the slab area must be formed to pour the concrete with 1:10 preparation, which consists of mixing 1 bag of cement and 10 cans of concrete. Water connections, drains and electrical points must be exposed to the outside.