Perimeter area formwork

The location and size of the area for ​​each room is defined to incorporate water, drainage connections and electrical points. The perimeter of the slab area must be formed to pour the concrete with 1:10 preparation, which consists of mixing 1 bag of cement and 10 cans of concrete. Water connections, drains and electrical points must be exposed to the outside.